RESTORATION VIEWS
Demolition begins as the old roof shingles and deck The old framing is severely deteriorated and beyond
are removed to asses the condition of the framing. repair, so it will be entirely removed.
The old framing will be carefully removed to avoid The new roof framing will extend past the freight
collapse of the inside ceiling and possible wall damage. house wall and connect to the station, on the right.

New roof framing is going in place in this late March, The east end of the freight house being framed. Note
2009 view. This is the freight house end next to the the projecting rafter end on the left side. This is the full
station building, where the breezeway will soon be. reach of the canopy overhang. .
.Breezeway end of the freight house as framing work Another view of the hip rafter showing the full extent of
moves toward the station. the canopy overhang. The this part of the roof will be
framed after the supporting brackets are in place.
Station wall waiting for the freight house roof framing East end, framing almost completed, waiting for the
to extend over to it, forming the breezeway. sheathing to be applied, forming the new roof deck.
The roof deck is almost completed, and the felt paper After this end is decked and papered, the new beams
is being applied. for holding up the breezeway will be installed.

HOME | HISTORY | OUR VISION | RESTORATION PROGRESS | GALLERY I | GALLERY II | FUNDING | CONTACT US | LINKS

DWGSRP©2007